| loc_id | Section | Activity | Status | remarks | |
|---|---|---|---|---|---|
| ARAL1 | 1. Computer, Software and PLC Communication System | a) MIS Application Version. | OK | Edit | Details | Delete | |
| ARAL1 | 1. Computer, Software and PLC Communication System | b) MIS Application Updating during Visit. | OK | Edit | Details | Delete | |
| ARAL1 | 1. Computer, Software and PLC Communication System | c) Vision Application Working. | OK | Edit | Details | Delete | |
| ARAL1 | 1. Computer, Software and PLC Communication System | d) Checking of PLC Communication System. | OK | Edit | Details | Delete | |
| ARAL1 | 1. Computer, Software and PLC Communication System | e) Checking of UPS Input and Output Supply (Single Phase). | OK | Edit | Details | Delete | |
| ARAL1 | 1. Computer, Software and PLC Communication System | f) Checking of Leakage Voltage at UPS Input and Output. | OK | Edit | Details | Delete | |
| ARAL1 | 1. Computer, Software and PLC Communication System | g) Dur-Drishti & MIS Configuration. | OK | Edit | Details | Delete | |
| ARAL1 | 2. VISION READER AND ENCODING STATION | a) Checking of Keypad physical condition. | OK | Edit | Details | Delete | |
| ARAL1 | 2. VISION READER AND ENCODING STATION | b) Checking the operation of the stoppers and pneumatic system. | OK | Edit | Details | Delete | |
| ARAL1 | 2. VISION READER AND ENCODING STATION | c) Checking the Communication System. | OK | Edit | Details | Delete | |
| ARAL1 | 2. VISION READER AND ENCODING STATION | d) Checking of Leakage Voltage in Filling Area. | OK | Edit | Details | Delete | |
| ARAL1 | 2. VISION READER AND ENCODING STATION | e) Checking Vision Reader Operation. | OK | Edit | Details | Delete | |
| ARAL1 | 2. VISION READER AND ENCODING STATION | f) Vision Reader and Encoding Sensor Positioning. | OK | Edit | Details | Delete | |
| ARAL1 | 2. VISION READER AND ENCODING STATION | g) Working of All LED Lights and Type of LED Lights. | OK | Edit | Details | Delete | |
| ARAL1 | 2. VISION READER AND ENCODING STATION | h) Checking the Com Port of Vision PC (mention whether used any converter or not). | OK | Edit | Details | Delete | |
| ARAL1 | 3. CAROUSEL AND FILLING MACHINE | a) Checking of Filling machine operation. | OK | Edit | Details | Delete | |
| ARAL1 | 3. CAROUSEL AND FILLING MACHINE | b) Checking of Earthing system and Earthing Interlock. | OK | Edit | Details | Delete | |
| ARAL1 | 3. CAROUSEL AND FILLING MACHINE | c) Checking of under Carousel Sensors positioning. | OK | Edit | Details | Delete | |
| ARAL1 | 3. CAROUSEL AND FILLING MACHINE | d) Checking of communication system. | OK | Edit | Details | Delete | |
| ARAL1 | 3. CAROUSEL AND FILLING MACHINE | e) Keypad condition. | OK | Edit | Details | Delete | |
| ARAL1 | 3. CAROUSEL AND FILLING MACHINE | f) Checking of Filling Machine levelling, tightening of Load Cell Bolts and Isolator Buffers. | OK | Edit | Details | Delete | |
| ARAL1 | 3. CAROUSEL AND FILLING MACHINE | g) Checking the condition and orientation of LPG hoses. | OK | Edit | Details | Delete | |
| ARAL1 | 3. CAROUSEL AND FILLING MACHINE | h) Continuity of filling head with Machine platform. | OK | Edit | Details | Delete | |
| ARAL1 | 3. CAROUSEL AND FILLING MACHINE | i) Checking the calibration of filling machines after maintenance work. | OK | Edit | Details | Delete | |
| ARAL1 | 3. CAROUSEL AND FILLING MACHINE | j) Analysing the data of MIS Reports and fine-tuning of filling machines. | OK | Edit | Details | Delete | |
| ARAL1 | 3. CAROUSEL AND FILLING MACHINE | k) Checking of gas stop valve and filling head. | OK | Edit | Details | Delete | |
| ARAL1 | 3. CAROUSEL AND FILLING MACHINE | l) Checking of pneumatic system of filling machine. | OK | Edit | Details | Delete | |
| ARAL1 | 3. CAROUSEL AND FILLING MACHINE | m) Checking of Air FRL. | OK | Edit | Details | Delete | |
| ARAL1 | 3. CAROUSEL AND FILLING MACHINE | n) Checking of Air Distributor. | OK | Edit | Details | Delete | |
| ARAL1 | 3. CAROUSEL AND FILLING MACHINE | o) Lubrication and checking of centre column. | OK | Edit | Details | Delete | |
| ARAL1 | 3. CAROUSEL AND FILLING MACHINE | p) Air Pressure 5-6 bar. | OK | Edit | Details | Delete | |
| ARAL1 | 3. CAROUSEL AND FILLING MACHINE | q) Checking of load cell safety bolt. | OK | Edit | Details | Delete | |
| ARAL1 | 3. CAROUSEL AND FILLING MACHINE | r) LPG pressure during visit period. | OK | Edit | Details | Delete | |
| ARAL1 | 3. CAROUSEL AND FILLING MACHINE | s) Pneumatics of DP Valve. | OK | Edit | Details | Delete | |
| ARAL1 | 3. CAROUSEL AND FILLING MACHINE | t) Working of DP Valve. | OK | Edit | Details | Delete | |
| ARAL1 | 3. CAROUSEL AND FILLING MACHINE | u) Check free movement of Carousel wheels. | OK | Edit | Details | Delete | |
| ARAL1 | 3. CAROUSEL AND FILLING MACHINE | v) Lubrication of Carousel wheels and Rails, and wear-tear of Carousel Wheel and Rail. | OK | Edit | Details | Delete | |
| ARAL1 | 3. CAROUSEL AND FILLING MACHINE | w) Cleaning and Lubrication of Carousel rail. | OK | Edit | Details | Delete | |
| ARAL1 | 3. CAROUSEL AND FILLING MACHINE | x) LPG leakage from filling head. | OK | Edit | Details | Delete | |
| ARAL1 | 3. CAROUSEL AND FILLING MACHINE | x.1) LPG leakage from GSV. | OK | Edit | Details | Delete | |
| ARAL1 | 3. CAROUSEL AND FILLING MACHINE | x.2) LPG leakage from PAV. | OK | Edit | Details | Delete | |
| ARAL1 | 3. CAROUSEL AND FILLING MACHINE | x.3) LPG leakage from Ball valves. | OK | Edit | Details | Delete | |
| ARAL1 | 3. CAROUSEL AND FILLING MACHINE | x.4) LPG leakage from flanges/joints. | OK | Edit | Details | Delete | |
| ARAL1 | 4. INTRODUCTION AND EJECTION UNIT | a) Check positioning of introduction and ejection sensors. | OK | Edit | Details | Delete | |
| ARAL1 | 4. INTRODUCTION AND EJECTION UNIT | b) Lubrication and Checking rail and rail bearing of introduction unit. | OK | Edit | Details | Delete | |
| ARAL1 | 4. INTRODUCTION AND EJECTION UNIT | c) Checking front and side Teflon pad of introduction pusher. | OK | Edit | Details | Delete | |
| ARAL1 | 4. INTRODUCTION AND EJECTION UNIT | d) Checking level of introduction matching plate with 24 Stn. | OK | Edit | Details | Delete | |
| ARAL1 | 4. INTRODUCTION AND EJECTION UNIT | e) Lubrication and Checking rail and rail bearing of ejection puller. | OK | Edit | Details | Delete | |
| ARAL1 | 4. INTRODUCTION AND EJECTION UNIT | f) Checking mouth and side Teflon pad of ejection puller. | OK | Edit | Details | Delete | |
| ARAL1 | 4. INTRODUCTION AND EJECTION UNIT | g) Checking level of ejection "E" plate with 24 FM. | OK | Edit | Details | Delete | |
| ARAL1 | 4. INTRODUCTION AND EJECTION UNIT | h) Check loosening of foundation bolts of introduction and ejection unit. | OK | Edit | Details | Delete | |
| ARAL1 | 5. Dual Static CS | a) Checking of stopper and roller condition. | OK | Edit | Details | Delete | |
| ARAL1 | 5. Dual Static CS | b) Checking of level of check scale. | OK | Edit | Details | Delete | |
| ARAL1 | 5. Dual Static CS | c) Lifting Table and Checker Plate condition of both the Platforms. | OK | Edit | Details | Delete | |
| ARAL1 | 5. Dual Static CS | d) Checking of the calibration and accuracy of scale. | OK | Edit | Details | Delete | |
| ARAL1 | 5. Dual Static CS | e) Rubber Isolator condition. | OK | Edit | Details | Delete | |
| ARAL1 | 5. Dual Static CS | f) Sensors Positioning. | OK | Edit | Details | Delete | |
| ARAL1 | 5. Dual Static CS | g) Lubrication and Checking Guide Rod and Guide Bush of Rejection Pusher. | OK | Edit | Details | Delete | |
| ARAL1 | 5. Dual Static CS | h) Conveyor and Chain condition from Ejection to Rejection Pusher. | OK | Edit | Details | Delete | |
| ARAL1 | 6. VLD/OLD SECTION | a) Servicing of Test Heads. | OK | Edit | Details | Delete | |
| ARAL1 | 6. VLD/OLD SECTION | b) Check pneumatic connections. | OK | Edit | Details | Delete | |
| ARAL1 | 6. VLD/OLD SECTION | c) Cleaning and lubrication of guide rods, guide bush and clamping arms. | OK | Edit | Details | Delete | |
| ARAL1 | 6. VLD/OLD SECTION | d) Check condition of lifting Teflon pad and clamping rollers. | OK | Edit | Details | Delete | |
| ARAL1 | 6. VLD/OLD SECTION | e) Lubrication and Checking Guide Rod and Guide Bush of Rejection Pusher. | OK | Edit | Details | Delete | |
| ARAL1 | 6. VLD/OLD SECTION | f) Check calibration of test cylinder and Valve & Bung Leak Detector. | OK | Edit | Details | Delete | |
| ARAL1 | 6. VLD/OLD SECTION | g) Check repeatability of O Ring Leak Detector with dummy cylinders. | OK | Edit | Details | Delete | |
| ARAL1 | 6. VLD/OLD SECTION | h) Mist and Moisture separator installed at ELD and working properly. | OK | Edit | Details | Delete | |
| ARAL1 | 6. VLD/OLD SECTION | i) IR sensor and OLD Raw Count and Scaled Value in Idle condition. | OK | Edit | Details | Delete | |
| ARAL1 | 7. Integrated Weight Correction Unit | a) Checking of ICU operation in Auto and Manual Mode. | OK | Edit | Details | Delete | |
| ARAL1 | 7. Integrated Weight Correction Unit | b) Checking of ICU alignment and Any Loosing. | OK | Edit | Details | Delete | |
| ARAL1 | 7. Integrated Weight Correction Unit | c) Buffer Condition of ICU machine. | OK | Edit | Details | Delete | |
| ARAL1 | 7. Integrated Weight Correction Unit | d) Condition of GSV and Filling Head. | OK | Edit | Details | Delete | |
| ARAL1 | 7. Integrated Weight Correction Unit | e) Checking of Pneumatic Connection, PN Cylinder Condition and Rejection Pusher. | OK | Edit | Details | Delete | |
| ARAL1 | 7. Integrated Weight Correction Unit | f) Hose Condition and Checking Any Leakage. | OK | Edit | Details | Delete | |
| ARAL1 | 7. Integrated Weight Correction Unit | g) Whether Evacuation process is working or not? If not please mention the Reason. | OK | Edit | Details | Delete | |
| ARAL1 | 7. Integrated Weight Correction Unit | h) Checking of Positive and Negative Tare Weight Feature in ICU. | OK | Edit | Details | Delete | |
| ARAL1 | 8. General Check Points | a) Checking of body earthing with proper thimble connection. | OK | Edit | Details | Delete | |
| ARAL1 | 8. General Check Points | b) Physical condition of Cables. | OK | Edit | Details | Delete | |
| ARAL1 | 8. General Check Points | c) All IS Barriers are operational; if not mention in notes. | OK | Edit | Details | Delete | |
| ARAL1 | 8. General Check Points | d) Gasket of FLP Panel/JB's Door. | OK | Edit | Details | Delete | |
| ARAL1 | 8. General Check Points | e) Checking of all FLP enclosure, properly closed and bolts tightened. | OK | Edit | Details | Delete | |
| ARAL1 | 8. General Check Points | f) Checking of Gland size and Cable Glanding of Slip Ring. | OK | Edit | Details | Delete | |
| ARAL1 | 8. General Check Points | g) All Carousel Interlock Feedbacks connected and working. | OK | Edit | Details | Delete | |
| ARAL1 | 8. General Check Points | h) Check leakage from Pop-up Valves at LPG Manifold. | OK | Edit | Details | Delete | |
| ARAL1 | 8. General Check Points | i) Check Hose condition for bulge or LPG leakage. | OK | Edit | Details | Delete | |
| ARAL1 | 8. General Check Points | j) Nylon Pads/roller available on pusher/Stoppers/Clamping arms. | OK | Edit | Details | Delete | |
| ARAL1 | 8. General Check Points | k) Checking of gearbox motors for overheating. | OK | Edit | Details | Delete | |
| ARAL1 | 8. General Check Points | l) Proper installation and working of lube tank systems. | OK | Edit | Details | Delete | |
| ARAL1 | 8. General Check Points | m) Condition of Pressure Gauge in Carousel Central Column, Carousel Manifold and ICU Manifold. | OK | Edit | Details | Delete | |
| UJJAINL1 | 1. Computer, Software and PLC Communication System | a) MIS Application Version. | OK | MIS-3.6.1.7 | Edit | Details | Delete |
| UJJAINL1 | 1. Computer, Software and PLC Communication System | b) MIS Application Updating during Visit. | OK | Edit | Details | Delete | |
| UJJAINL1 | 1. Computer, Software and PLC Communication System | c) Vision Application Working. | OK | Edit | Details | Delete | |
| UJJAINL1 | 1. Computer, Software and PLC Communication System | d) Checking of PLC Communication System. | OK | Edit | Details | Delete | |
| UJJAINL1 | 1. Computer, Software and PLC Communication System | e) Checking of UPS Input and Output Supply (Single Phase). | OK | Edit | Details | Delete | |
| UJJAINL1 | 1. Computer, Software and PLC Communication System | f) Checking of Leakage Voltage at UPS Input and Output. | OK | Edit | Details | Delete | |
| UJJAINL1 | 1. Computer, Software and PLC Communication System | g) Dur-Drishti & MIS Configuration. | OK | Edit | Details | Delete | |
| UJJAINL1 | 2. VISION READER AND ENCODING STATION | a) Checking of Keypad physical condition. | OK | Edit | Details | Delete | |
| UJJAINL1 | 2. VISION READER AND ENCODING STATION | b) Checking the operation of the stoppers and pneumatic system. | OK | Edit | Details | Delete | |
| UJJAINL1 | 2. VISION READER AND ENCODING STATION | c) Checking the Communication System. | OK | Edit | Details | Delete | |
| UJJAINL1 | 2. VISION READER AND ENCODING STATION | d) Checking of Leakage Voltage in Filling Area. | OK | Edit | Details | Delete | |
| UJJAINL1 | 2. VISION READER AND ENCODING STATION | e) Checking Vision Reader Operation. | OK | Edit | Details | Delete | |
| UJJAINL1 | 2. VISION READER AND ENCODING STATION | f) Vision Reader and Encoding Sensor Positioning. | OK | Edit | Details | Delete | |
| UJJAINL1 | 2. VISION READER AND ENCODING STATION | g) Working of All LED Lights and Type of LED Lights. | OK | Edit | Details | Delete | |
| UJJAINL1 | 2. VISION READER AND ENCODING STATION | h) Checking the Com Port of Vision PC (mention whether used any converter or not). | OK | Edit | Details | Delete | |
| UJJAINL1 | 3. CAROUSEL AND FILLING MACHINE | a) Checking of Filling machine operation. | OK | Edit | Details | Delete | |
| UJJAINL1 | 3. CAROUSEL AND FILLING MACHINE | b) Checking of Earthing system and Earthing Interlock. | OK | Edit | Details | Delete | |
| UJJAINL1 | 3. CAROUSEL AND FILLING MACHINE | c) Checking of under Carousel Sensors positioning. | OK | Edit | Details | Delete | |
| UJJAINL1 | 3. CAROUSEL AND FILLING MACHINE | d) Checking of communication system. | OK | Edit | Details | Delete | |
| UJJAINL1 | 3. CAROUSEL AND FILLING MACHINE | e) Keypad condition. | OK | Edit | Details | Delete | |
| UJJAINL1 | 3. CAROUSEL AND FILLING MACHINE | f) Checking of Filling Machine levelling, tightening of Load Cell Bolts and Isolator Buffers. | OK | Edit | Details | Delete | |
| UJJAINL1 | 3. CAROUSEL AND FILLING MACHINE | g) Checking the condition and orientation of LPG hoses. | OK | Edit | Details | Delete | |
| UJJAINL1 | 3. CAROUSEL AND FILLING MACHINE | h) Continuity of filling head with Machine platform. | OK | Edit | Details | Delete | |
| UJJAINL1 | 3. CAROUSEL AND FILLING MACHINE | i) Checking the calibration of filling machines after maintenance work. | OK | Edit | Details | Delete | |
| UJJAINL1 | 3. CAROUSEL AND FILLING MACHINE | j) Analysing the data of MIS Reports and fine-tuning of filling machines. | OK | Edit | Details | Delete | |
| UJJAINL1 | 3. CAROUSEL AND FILLING MACHINE | k) Checking of gas stop valve and filling head. | OK | Edit | Details | Delete | |
| UJJAINL1 | 3. CAROUSEL AND FILLING MACHINE | l) Checking of pneumatic system of filling machine. | OK | Edit | Details | Delete | |
| UJJAINL1 | 3. CAROUSEL AND FILLING MACHINE | m) Checking of Air FRL. | OK | Edit | Details | Delete | |
| UJJAINL1 | 3. CAROUSEL AND FILLING MACHINE | n) Checking of Air Distributor. | OK | Edit | Details | Delete | |
| UJJAINL1 | 3. CAROUSEL AND FILLING MACHINE | o) Lubrication and checking of centre column. | OK | Edit | Details | Delete | |
| UJJAINL1 | 3. CAROUSEL AND FILLING MACHINE | p) Air Pressure 5-6 bar. | OK | Edit | Details | Delete | |
| UJJAINL1 | 3. CAROUSEL AND FILLING MACHINE | q) Checking of load cell safety bolt. | OK | Edit | Details | Delete | |
| UJJAINL1 | 3. CAROUSEL AND FILLING MACHINE | r) LPG pressure during visit period. | OK | Edit | Details | Delete | |
| UJJAINL1 | 3. CAROUSEL AND FILLING MACHINE | s) Pneumatics of DP Valve. | OK | Edit | Details | Delete | |
| UJJAINL1 | 3. CAROUSEL AND FILLING MACHINE | t) Working of DP Valve. | OK | Edit | Details | Delete | |
| UJJAINL1 | 3. CAROUSEL AND FILLING MACHINE | u) Check free movement of Carousel wheels. | OK | Edit | Details | Delete | |
| UJJAINL1 | 3. CAROUSEL AND FILLING MACHINE | v) Lubrication of Carousel wheels and Rails, and wear-tear of Carousel Wheel and Rail. | OK | Edit | Details | Delete | |
| UJJAINL1 | 3. CAROUSEL AND FILLING MACHINE | w) Cleaning and Lubrication of Carousel rail. | OK | Edit | Details | Delete | |
| UJJAINL1 | 3. CAROUSEL AND FILLING MACHINE | x) LPG leakage from filling head. | OK | Edit | Details | Delete | |
| UJJAINL1 | 3. CAROUSEL AND FILLING MACHINE | x.1) LPG leakage from GSV. | OK | Edit | Details | Delete | |
| UJJAINL1 | 3. CAROUSEL AND FILLING MACHINE | x.2) LPG leakage from PAV. | OK | Edit | Details | Delete | |
| UJJAINL1 | 3. CAROUSEL AND FILLING MACHINE | x.3) LPG leakage from Ball valves. | OK | Edit | Details | Delete | |
| UJJAINL1 | 3. CAROUSEL AND FILLING MACHINE | x.4) LPG leakage from flanges/joints. | OK | Edit | Details | Delete | |
| UJJAINL1 | 4. INTRODUCTION AND EJECTION UNIT | a) Check positioning of introduction and ejection sensors. | OK | Edit | Details | Delete | |
| UJJAINL1 | 4. INTRODUCTION AND EJECTION UNIT | b) Lubrication and Checking rail and rail bearing of introduction unit. | OK | Edit | Details | Delete | |
| UJJAINL1 | 4. INTRODUCTION AND EJECTION UNIT | c) Checking front and side Teflon pad of introduction pusher. | OK | Edit | Details | Delete | |
| UJJAINL1 | 4. INTRODUCTION AND EJECTION UNIT | d) Checking level of introduction matching plate with 24 Stn. | OK | Edit | Details | Delete | |
| UJJAINL1 | 4. INTRODUCTION AND EJECTION UNIT | e) Lubrication and Checking rail and rail bearing of ejection puller. | OK | Edit | Details | Delete | |
| UJJAINL1 | 4. INTRODUCTION AND EJECTION UNIT | f) Checking mouth and side Teflon pad of ejection puller. | OK | Edit | Details | Delete | |
| UJJAINL1 | 4. INTRODUCTION AND EJECTION UNIT | g) Checking level of ejection "E" plate with 24 FM. | OK | Edit | Details | Delete | |
| UJJAINL1 | 4. INTRODUCTION AND EJECTION UNIT | h) Check loosening of foundation bolts of introduction and ejection unit. | OK | Edit | Details | Delete | |
| UJJAINL1 | 5. Dual Static CS | a) Checking of stopper and roller condition. | OK | Edit | Details | Delete | |
| UJJAINL1 | 5. Dual Static CS | b) Checking of level of check scale. | OK | Edit | Details | Delete | |
| UJJAINL1 | 5. Dual Static CS | c) Lifting Table and Checker Plate condition of both the Platforms. | OK | Edit | Details | Delete | |
| UJJAINL1 | 5. Dual Static CS | d) Checking of the calibration and accuracy of scale. | OK | Edit | Details | Delete | |
| UJJAINL1 | 5. Dual Static CS | e) Rubber Isolator condition. | OK | Edit | Details | Delete | |
| UJJAINL1 | 5. Dual Static CS | f) Sensors Positioning. | OK | Edit | Details | Delete | |
| UJJAINL1 | 5. Dual Static CS | g) Lubrication and Checking Guide Rod and Guide Bush of Rejection Pusher. | OK | Edit | Details | Delete | |
| UJJAINL1 | 5. Dual Static CS | h) Conveyor and Chain condition from Ejection to Rejection Pusher. | OK | Edit | Details | Delete | |
| UJJAINL1 | 6. VLD/OLD SECTION | a) Servicing of Test Heads. | OK | Edit | Details | Delete | |
| UJJAINL1 | 6. VLD/OLD SECTION | b) Check pneumatic connections. | OK | Edit | Details | Delete | |
| UJJAINL1 | 6. VLD/OLD SECTION | c) Cleaning and lubrication of guide rods, guide bush and clamping arms. | OK | Edit | Details | Delete | |
| UJJAINL1 | 6. VLD/OLD SECTION | d) Check condition of lifting Teflon pad and clamping rollers. | OK | Edit | Details | Delete | |
| UJJAINL1 | 6. VLD/OLD SECTION | e) Lubrication and Checking Guide Rod and Guide Bush of Rejection Pusher. | OK | Edit | Details | Delete | |
| UJJAINL1 | 6. VLD/OLD SECTION | f) Check calibration of test cylinder and Valve & Bung Leak Detector. | OK | Edit | Details | Delete | |
| UJJAINL1 | 6. VLD/OLD SECTION | g) Check repeatability of O Ring Leak Detector with dummy cylinders. | OK | Edit | Details | Delete | |
| UJJAINL1 | 6. VLD/OLD SECTION | h) Mist and Moisture separator installed at ELD and working properly. | OK | Edit | Details | Delete | |
| UJJAINL1 | 6. VLD/OLD SECTION | i) IR sensor and OLD Raw Count and Scaled Value in Idle condition. | OK | Edit | Details | Delete | |
| UJJAINL1 | 7. Integrated Weight Correction Unit | a) Checking of ICU operation in Auto and Manual Mode. | OK | Edit | Details | Delete | |
| UJJAINL1 | 7. Integrated Weight Correction Unit | b) Checking of ICU alignment and Any Loosing. | OK | Edit | Details | Delete | |
| UJJAINL1 | 7. Integrated Weight Correction Unit | c) Buffer Condition of ICU machine. | OK | Edit | Details | Delete | |
| UJJAINL1 | 7. Integrated Weight Correction Unit | d) Condition of GSV and Filling Head. | OK | Edit | Details | Delete | |
| UJJAINL1 | 7. Integrated Weight Correction Unit | e) Checking of Pneumatic Connection, PN Cylinder Condition and Rejection Pusher. | OK | Edit | Details | Delete | |
| UJJAINL1 | 7. Integrated Weight Correction Unit | f) Hose Condition and Checking Any Leakage. | OK | Edit | Details | Delete | |
| UJJAINL1 | 7. Integrated Weight Correction Unit | g) Whether Evacuation process is working or not? If not please mention the Reason. | OK | Edit | Details | Delete | |
| UJJAINL1 | 7. Integrated Weight Correction Unit | h) Checking of Positive and Negative Tare Weight Feature in ICU. | OK | Edit | Details | Delete | |
| UJJAINL1 | 8. General Check Points | a) Checking of body earthing with proper thimble connection. | OK | Edit | Details | Delete | |
| UJJAINL1 | 8. General Check Points | b) Physical condition of Cables. | OK | Edit | Details | Delete | |
| UJJAINL1 | 8. General Check Points | c) All IS Barriers are operational; if not mention in notes. | OK | Edit | Details | Delete | |
| UJJAINL1 | 8. General Check Points | d) Gasket of FLP Panel/JB's Door. | OK | Edit | Details | Delete | |
| UJJAINL1 | 8. General Check Points | e) Checking of all FLP enclosure, properly closed and bolts tightened. | OK | Edit | Details | Delete | |
| UJJAINL1 | 8. General Check Points | f) Checking of Gland size and Cable Glanding of Slip Ring. | OK | Edit | Details | Delete | |
| UJJAINL1 | 8. General Check Points | g) All Carousel Interlock Feedbacks connected and working. | OK | Edit | Details | Delete | |
| UJJAINL1 | 8. General Check Points | h) Check leakage from Pop-up Valves at LPG Manifold. | OK | Edit | Details | Delete | |
| UJJAINL1 | 8. General Check Points | i) Check Hose condition for bulge or LPG leakage. | OK | Edit | Details | Delete | |
| UJJAINL1 | 8. General Check Points | j) Nylon Pads/roller available on pusher/Stoppers/Clamping arms. | OK | Edit | Details | Delete | |
| UJJAINL1 | 8. General Check Points | k) Checking of gearbox motors for overheating. | OK | Edit | Details | Delete | |
| UJJAINL1 | 8. General Check Points | l) Proper installation and working of lube tank systems. | OK | Edit | Details | Delete | |
| UJJAINL1 | 8. General Check Points | m) Condition of Pressure Gauge in Carousel Central Column, Carousel Manifold and ICU Manifold. | OK | Edit | Details | Delete |